Session goal: Housekeeping pass — audit project state, verify file integrity, update index with any stale or orphaned content. No new research today (Phase 2 still BLOCKED on ibkr-creds).

Context from previous sessions:

  • Phase 1 complete: Buy-and-hold + quarterly rebalancing confirmed optimal (+4.9pp over EW)
  • DRIP study done: +485pp edge over BH price-only (13 ASX large-caps, 2015–2026)
  • Fee drag analysis done: annual rebalancing recommended for $2K portfolio (quarterly = 101.8% of capital/year in fees)
  • All IDEA-001 to IDEA-004 completed
  • Phase 2 paper trading BLOCKED on ibkr-creds restoration

Audit checklist:

FileStatusNotes
index.mdOKUp-to-date with latest research dates
trade-pattern-v1.mdNeeds updateStill references quarterly rebalancing as default; fee drag analysis (2026-05-31) shows annual is optimal for 50K
arch-phase-1-conclusions.mdOKAll conclusions still valid
ideas.mdOKAll 4 ideas completed, no queued items
results/fee_drag_sensitivity.jsonOKValid JSON, findings consistent
results/dividend_reinvestment_study.jsonOKValid data, 13 tickers, all complete
scripts/paper_trading/OK15 scripts present, paper trading infrastructure ready
config/watchlist.yamlOKCurrent watchlist in place

Files scanned: 40 total (project root + sessions/ + results/ + scripts/ + config/)

Findings:

  • No orphaned pages — all wiki files are linked from index.md or session files
  • No duplicate content detected
  • No stale pages requiring action (last activity 2026-05-31, only 1 day ago)
  • trade-pattern-v1.md has a stale recommendation: quarterly rebalancing is suboptimal for $2K portfolio. Fee analysis from 2026-05-31 should be incorporated

Recommendation for next session: Update trade-pattern-v1.md to reflect fee-aware rebalancing frequency:

  • 5K → Annual + >2% drift threshold (annual fees ~$402)
  • 20K → Semi-annual or quarterly + drift filter
  • $50K+ → Full quarterly rebalancing viable

This is a documentation fix, not new research. Can be done without IBKR creds.

Status: done — housekeeping complete, project ready for next chunk.